This is a remote position.
Role: Techno-Functional Lead
The core objective of this Scope of Work is to clean up the MRO materials currently residing in S4.
S4 contains 188K MRO materials, 118K (63%) have been determined to be obsolete
Removing the obsolete materials and cleansing the remaining 70K will:
The scope of work includes:
NCSA College Recruiting
BNP Paribas
Syska Hennessy Group
Contrato-Formación
KENNY WASTE MANAGEMENT